*
FOUNDRY
(Total area under Roof = 4000 SQ. Metres)
MATERIAL CAST
1.
CAST IRON TO MAX WEIGHT 8 TONS UNIT
2.
SPEROIDAL GRAPHITE IRON TO 2 TONS UNIT
3.
CAST STEEL TO 1 TON UNIT
4.
STAINLESS STEEL TO 500kgs. UNIT
5.
CHROME CAST IRON - ALL GRADES TO 1 TON UNIT
6.
NI-HARD ALL GRADES TO 1 TON UNIT
7.
NI-RESIST TO 1 TON i.e. BS1452, BS3100 and BS2789 All Grades
8.
PHOSPHOR BRONZE
9.
BRASS
10.
GUNMETAL
11.
WHITEMETAL
12.
ALUMINIUM
BURNER NOZZLES
FOUNDRY EQUIPMENT
MELTING:
1.
2 X 1 TON ELECTRIC INDUCTION FURNACES
2.
1 X 36 INCH - 3 TONS/HOUR CUPOLA
3.
1 X 28 INCH - 2 TONS/HOUR CUPOLA
4.
4 X GAS FIRED FURNACES FOR NON-FERROUS - 1500kgs. Max.
MOULDING:
1.
1 X 10 TON/HOUR CONTINIOUS SAND MIXER
2.
5 X PIN LIFT JOLT SQUEEZE MOULDING MACHINES
3.
PRODUCTION CASTING MECHANISED TRACK SYSTEM
LABORATORY
1.
COMPUTERIZED ARLAB METAL ANALYSER
PATTERN SHOP
1.
WOOD, FIBRE GLASS AND METAL PATTERNS
- To Top -